Flash Education

Question

A machine raises a load of 750 N through a height of 16m in 5s. Calculate: (i) the energy spent by the machine. (ii) the power of the machine if it is 100% efficient.

WhatsApp

Answer

Force = 750N

height or distance moved = 16 m

time = 5 s

(i) Energy spent or the work done = F × S

Work = 750 × 16 = 12000 J

Therefore, energy spent is equal to 12000 J

(ii) Power = Work\over Time

= 12000\over 5

= 2400 W

Therefore, power spent is equal to 2400 W.

💡 Some Related Questions

Close Menu