Force = 750N
height or distance moved = 16 m
time = 5 s
(i) Energy spent or the work done = F × S
Work = 750 × 16 = 12000 J
Therefore, energy spent is equal to 12000 J
(ii) Power = Work\over Time
= 12000\over 5
= 2400 W
Therefore, power spent is equal to 2400 W.